Health Permitting

Building for a Permitted Use?

If your build needs to pass a county health department inspection, start here. We'll walk you through the process, get you the schematics you need, and build to your county's specs once you're approved.
How It Works

Health-permitted builds follow a different path than our standard orders. The permitting process involves your county health department — we provide the schematics and build expertise, but the application and approval process is between you and your county.

1
Tell us about your project
Fill out the permitting inquiry form at the bottom of this page. It takes about 5 minutes and helps us understand where you are in the process. You don't need to have all the answers yet.
2
Gather your county's requirements
Before your consult, you'll need to contact your county health department and collect their specific requirements. This is essential — we can't design to spec without knowing what your county requires.
3
Permitting consultation
Once you've gathered your county's requirements, you'll be directed to schedule a 30-minute consult. We'll review everything together — dimensions, sink specs, plumbing layout, NSF requirements — and confirm what we can build for you.
4
Schematics & plumbing diagrams
After the consult, we produce detailed build schematics and plumbing diagrams for a flat fee of $300. These documents show your build dimensions, plumbing layout, sink placement, and countertop specs — everything your county needs to review your application.
5
You submit to your county
Take the schematics and submit your health permit application to your county. This step is entirely on you — we don't submit applications or follow up with health departments. Timelines vary by county and can take weeks to months.
6
Approved? Let's build.
Once your county approves your application, let us know and we'll move forward with your build order. From here, the process follows our standard Semi-Custom or Custom Elite path: estimate, project agreement, deposit, and production. If your county requires changes to the design, we'll review feasibility before proceeding.
Before Your Consult

Projects submitted for county approval require a permitting consult before your build begins. Before booking, please confirm you have gathered the following from your local health department:

Gather These First
  • Your county's health permit application (downloaded or requested)
  • Required NSF certifications for your equipment
  • Countertop material requirements for your county
  • Sink size and compartment requirements
  • Any specific plumbing hookup specs
Good to know

If you haven't researched your county's requirements yet, that's ok — the inquiry form will walk you through what to gather. Just know that we can't schedule your consult until you have that info ready.

What to Expect
Our Role — What We Do

RidgeCraft is a woodworking and fabrication business. We are not permitting consultants, health code specialists, or regulatory advisors. Our role is to build your equipment to your specifications.

We can support your process in these limited ways:

  • Provide build schematics and plumbing diagrams upon request ($300)
  • Accommodate specific construction requirements documented by your health department
  • Modify designs to meet stated requirements, provided they are submitted in writing before your order is placed
Your Responsibilities — What We Do Not Do

The following are solely the responsibility of the customer. RidgeCraft will not perform, research, or advise on any of the items below:

  • Contacting your local or state health department
  • Researching applicable health codes or equipment standards for your jurisdiction
  • Determining whether a specific build configuration will be approved
  • Submitting applications or documentation to any regulatory agency on your behalf
  • Following up with health departments regarding approval status
  • Making design changes after an order is placed due to permitting requirements — change order fees may apply
Cost & Timeline
Schematic & Diagram Fee

The $300 schematic fee covers drafting of your build schematics and plumbing diagrams. This is a separate fee from your build deposit — it covers the design and documentation work regardless of whether you move forward with a build order.

Build Pricing

Once your permit is approved and you're ready to order, your build follows standard Semi-Custom (starting at $1,500) or Custom Elite (starting at $3,500) pricing. Payment is 45% deposit, 35% at production, and 20% at completion. Your estimate will reflect any permitting-specific specs like NSF-certified equipment or custom plumbing layouts.

Timeline

The permitting process timeline depends entirely on your county — approval can take anywhere from a few weeks to several months. Once approved, Semi-Custom builds take 8–10 weeks from deposit; Custom Elite builds take 12–16 weeks from deposit.

Start Your Permitting Inquiry

Ready to get the process started? Fill out our permitting inquiry form — it takes about 5 minutes. After you submit, you'll be redirected to schedule your permitting consult, and we'll send a confirmation email with the scheduling link in case you need it later.

We'll reach out within one business day to discuss your project.

Start Permitting Inquiry →
Not sure if you need a permit?

We can help you figure it out.

If you're not sure whether your business requires a health permit, reach out and we'll point you in the right direction. If you don't need permitting, head to our standard order form to get started.

Email us at info@ridgecraftshops.com or call 714.519.6410